Here is exactly what has to be true, what we supply at each step, and the one trap that catches most first-time importers.
A prefabricated home imported into Australia must satisfy the National Construction Code (NCC), administered by the Australian Building Codes Board. Compliance is assessed by a building surveyor or private certifier at the point of approval in your state or territory — not at the factory gate in China.
So the manufacturer's role is to supply a building that can be shown to comply, and the documentation to prove it. That is the job we take seriously.
Design wind speed and wind class (AS 4055) vary enormously — from sheltered suburban Melbourne to cyclonic northern Queensland. Tell us your location and we supply a fixing and anchoring schedule to suit.
Site classification to AS 2870 determines footing and slab design. That is your local engineer's work; we supply the building's loads and reactions so they can do it.
NatHERS star ratings and glazing requirements (AS 2047 / AS 1288) apply to the completed dwelling. We can supply higher-specification insulation and glazing to reach your climate zone's rating.
We build to your electrical standard — 230 V/50 Hz with Australian-style switchgear layout and RCD protection. Final connection and certification is done by a licensed local electrician, as it must be.

WaterMark is mandatory for plumbing and drainage products in Australia. A licensed plumber cannot legally connect a fitting that does not carry it.
If a unit arrives with plumbing already installed and that plumbing is not WaterMark certified, the plumber cannot connect it to mains water — and the fittings usually cannot be reached to replace without opening up walls and floors.
Our answer is the dry-shell build. We ship the unit with pipework runs, wall linings and service penetrations prepared, but without the final fittings installed. Your local plumber fits WaterMark-certified taps, mixers, shower heads and sanitaryware on site, signs it off, and the connection is legal and warrantable.
The result is a slightly different build sequence, not a worse building — and it removes the single biggest risk of importing a prefabricated home into Australia.
Services roughed in, final fittings installed locally. Always compliant, and the safe default for a first import.
We specify WaterMark-certified fittings for factory installation and document every component for your certifier.
Lead content in wetted surfaces is being progressively restricted in Australia. We can supply lead-free compliant fittings on request — ask us for the current position in your state.
Certifications are held by the manufacturing facility. We provide copies and issuing-body details with every quotation so you can verify them yourself.
Where the destination market requires CE marking for the components we supply — electrical items, glazing and fixings — the manufacturer's Declaration of Conformity and EU authorised representative details are provided with the quotation.
Quality management system at the manufacturing facility — certificate copies and issuing-body details supplied with every quotation.
Environmental management system at the manufacturing facility — certificate copies and issuing-body details supplied with every quotation.
Third-party pre-shipment inspection, available on request.
Certificate numbers can be checked with the issuing body. Before you place an order, ask us for the certificate copy and the issuing organisation's details, and confirm it covers the specific product and standard you need. We would rather answer that question now than have it surface at your certifier's desk.
| Document | Purpose |
|---|---|
| Commercial invoice | Customs valuation and payment record. |
| Packing list | Container contents, weights and dimensions for unloading. |
| Bill of lading | Title document and release of cargo. |
| Certificate of origin | Supports preferential duty treatment where applicable (ChAFTA). |
| HS classification advice | Correct tariff classification — typically HS 9406.90 for prefabricated buildings. |
| Fumigation / ISPM 15 | Required for any timber packing or components. |
| Asbestos-free declaration | Australia prohibits asbestos in imported goods — a declaration is expected. |
| Structural & materials documentation | For your building surveyor or certifier's assessment. |
| Installation manual & drawings | For your assembly crew. |
| Pre-shipment inspection report | Optional third-party (SGS) inspection before the container is sealed. |
Tell us your location, how the unit will be used, and whether it connects to mains water and power. We will tell you what the build needs.